TechnipFMC clinches subsea contract for Ithaca Energy North Sea project

Must Read

OilNOW
OilNOW
OilNOW is an online-based Information and Resource Centre

TechnipFMC announced Monday that it has been awarded a significant Engineering, Procurement, Construction and Installation (EPCI) contract from Ithaca Energy (UK) Limited for the Captain Enhanced Oil Recovery (EOR) Project in the UK North Sea.

TechnipFMC will design, manufacture, deliver and install subsea equipment including a rigid riser caisson, water injection flexible flowline, umbilicals and associated equipment.

Jonathan Landes, President, Subsea at TechnipFMC, said the company is delighted to support Ithaca Energy on this important EOR expansion of the Captain field, utilizing its innovative design and installation technologies and solutions to unlock and maximize the recovery of hydrocarbons from the UK Continental Shelf.

“We look forward to helping Ithaca improve project economics, enhance performance and reduce emissions,” Landes said.

The Captain field lies approximately 145 kilometers (90 miles) northeast of Aberdeen, Scotland, in the Outer Moray Firth area of the UK North Sea, in water depths of around 105.5 meters (346 feet).

In Guyana, TechnipFMC has been awarded contracts by ExxonMobil for the production of the subsea systems for the Liza Phase 1 and 2 projects as well as the Payara Development.

- ADVERTISEMENT -
[td_block_social_counter]
spot_img

Partnered Events

Latest News

U.S. Bank confirms US$526M loan to help Guyana slash 460,000 tonnes of emissions annually

The Export-Import Bank of the United States (EXIM) confirmed that its Board approved a $526 million loan to Guyana...

More Articles Like This