TechnipFMC secures major subsea contract for Brazil field developments

Must Read

OilNOW
OilNOW
OilNOW is an online-based Information and Resource Centre

TechnipFMC has been awarded a major subsea contract from Petrobras for the Marlim and Voador fields, located offshore Brazil.

TechnipFMC will supply up to eight manifolds for production and injection, utilizing the all-electric Robotic Valve Controller (RVC). The contract also includes associated tools, spares and services.

The RVC is a unique robotic technology that replaces traditional subsea hydraulics, as well as thousands of mechanical parts, while providing real-time data and analysis on system performance. This results in a manifold that is smaller, less complex and less costly with a significantly reduced carbon footprint. Moreover, the RVC’s software can be remotely upgraded and maintained subsea, increasing the overall reliability and availability of the subsea system.

“We are honored that Petrobras has selected us to support the ongoing development of the Marlim and Voador fields. We look forward to executing this project using our local capabilities in Brazil and contributing to another important development in the country,” said Jonathan Landes, President Subsea at TechnipFMC.

Landes said TechnipFMC is very excited to bring new technology and automation capabilities to this project through the use of the RVC to operate the manifolds. “Our innovations in automation and electrification are helping our clients lower their operational expenditures and reduce the carbon intensity of their subsea projects.”

TechnipFMC set to deliver massive subsea production system for Payara development

In Guyana, TechnipFMC has been awarded contracts by ExxonMobil for the production of the subsea systems for the Liza Phase 1 and 2 projects as well as the Payara Development.

- ADVERTISEMENT -
[td_block_social_counter]
spot_img

Partnered Events

Latest News

Shearwater mobilizes Amazon Warrior for 3D survey offshore Suriname

Norwegian marine geosciences company Shearwater is deploying its Amazon Warrior vessel for a 150-day, 6,042 sq km 3D seismic...

More Articles Like This