MODEC seeking contractors for monitoring system on 250,000 bpd Errea Wittu FPSO

Must Read

OilNOW
OilNOW
OilNOW is an online-based Information and Resource Centre

MODEC Guyana is requesting contractor services for the annual maintenance and certification of the Environmental and Motion Monitoring System (EMMS) on the FPSO Errea Wittu

This vessel is expected to initially produce 250,000 barrels of oil per day (b/d), inject 350,000 b/d of water, and produce 540 million cubic feet per day (mcf/d) of gas, with a storage capacity of two million barrels of oil. 

MODEC hires Oslo-based company to supply compressed air system for Guyana FPSO | OilNOW

The Errea Wittu will be the fifth FPSO deployed offshore Guyana, boosting total oil production to over 1.1 million b/d. 

ExxonMobil operates the Stabroek Block, where all sanctioned projects, including the Uaru development for which the Errea Wittu FPSO is being constructed, are located.

ExxonMobil holds a 45% stake, with Hess and CNOOC holding 30% and 25%, respectively.

- ADVERTISEMENT -
spot_img

Partnered Events

Latest News

As Errea Wittu FPSO takes shape, MODEC deepens roots in Guyana with permanent office 

Merely days after the Errea Wittu FPSO arrived in Singapore for the next stage of construction, builder MODEC marked...

More Articles Like This